Wall Thickness Calculation

Silo wall thickness is governed by hoop tension from stored material pressure and external loads.

Hoop Tension

Maximum hoop tension occurs at the silo bottom and is calculated using Janssen or Reimbert theory.

Wind Loads

For tall silos, wind loads can significantly affect wall thickness requirements.