Other Categories
Engineering Design
10 articles
Featured
15 min read
Comprehensive comparison of international silo design standards including ASME, Eurocode 3, and GB 50009. Learn which standard applies to your project...
Dr. Zhang Wei
Aug 13, 2026
12 min read
Engineering method for calculating silo wall thickness including hoop tension, wind loads, and seismic considerations.
Li Minghua
Aug 13, 2026
14 min read
Foundation design for silos including soil bearing capacity, settlement analysis, and reinforcement requirements.
Wang Jianguo
Aug 13, 2026
16 min read
Seismic design principles for silos including dynamic analysis and ductility requirements.
Dr. Chen Xiaoli
Aug 13, 2026
11 min read
Understanding hopper flow patterns: mass flow vs funnel flow for reliable discharge.
Dr. Liu Yang
Aug 13, 2026
13 min read
Wind load analysis including vortex shedding and dynamic response for tall silos.
Zhao Pengfei
Aug 13, 2026
10 min read
Design for thermal expansion in silos, insulation systems, and temperature stress management.
Sun Weidong
Aug 13, 2026
12 min read
Comparison of bolted and welded connections for silos. Design and fabrication considerations.
Ma Qiang
Aug 13, 2026
14 min read
Corrosion protection systems for steel silos including coatings and cathodic protection.
Huang Lijun
Aug 13, 2026
11 min read
Design of silo ventilation and aeration systems for material quality preservation.
Dr. Wu Jianhua
Aug 13, 2026


