Diseño de Sistemas
Cómo funciona
The bulk material handling solution provides complete material flow from receipt to process: (1) Truck/rail/ship unloading station, (2) Mechanical or pneumatic conveying to storage, (3) Storage silos with discharge systems, (4) In-plant distribution to process points, (5) Weighing and batching integration, (6) Dust collection throughout, (7) Centralized control system with remote monitoring.
Inicie su proyecto hoy
Nuestros ingenieros diseñarán la solución óptima para sus necesidades
Hable con un ingeniero

