Solución de Almacenamiento de Cemento
Material: Cement (Portland, Blended, Masonry)
Diseño de Sistemas
Cómo funciona
The cement storage solution is a complete system including: (1) Pneumatic conveying from tanker unloading to silo top, (2) Distribution system for multi-silo installations, (3) Silo with fluidized bottom (fluidization air at 0.5-1.0 bar, 1-2 Nm³/m²/min), (4) Dust collection with pulse-jet cleaning, (5) Discharge system (rotary feeder + screw conveyor or pneumatic pump), (6) Level and pressure monitoring, (7) PLC-based control system with remote monitoring capability.
Inicie su proyecto hoy
Nuestros ingenieros diseñarán la solución óptima para sus necesidades
Hable con un ingeniero
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000