Manxing Solution
We provide you with solutions for various industries
From cement and thermal power to mining, ports and chemical plants, Manxing's bulk material storage and handling solutions adapt to the unique material characteristics of each industry. With 900+ silo projects delivered worldwide, our engineering team builds customized systems — silo types, conveying routes and dust-control specs matched to your throughput, climate and compliance needs.
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
6x10,000T Welded Clinker Silo System for San Miguel CorporationThis project is San Miguel Corporation, Davao, the Philippines 10x10000 tons steel silos system contracted by Manxing. Among which, there are six clinker steel silos.Material: ClinkerReserves: 60,000 tonsSilo Type: Large welded steel silo -
Indonesia 6,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Material: CementReserves: 6000 tonsSilo type: Spiral silo -
Baowu 3x5,000T Steel Slag Powder Steel Silos ProjectThe project is a domestic project undertaken by Manxing. It is 3 sets of spiral steel silos with a total storage capacity of 15,000t for the storage and disposal of steel slag powder at BAOWU Wuhan Metal Resources Limited CompanyMaterial: Steel Slag PowderReserves: 15,000 tonsSilo type: Spiral steel silo
Please feel free to give your inquiry in the form below.
We will reply you in 24 hours.








