Key Takeaways
- Total Cost of Ownership: Include installation, operation, and maintenance costs.
- Delivery Timeline: 8-16 weeks for standard silos, 16-24 for custom.
- Payment Terms: Typical 30% advance, 60% before shipment, 10% after commissioning.
- Warranty Coverage: 1-2 years structural, check coating warranty separately.
- After-Sales Support: Spare parts availability and technical support.
Table of Contents
Cost Breakdown
A buyer in Vietnam focused only on the silo price and chose the lowest bidder. After adding foundation, installation, electrical, and shipping, their total cost was 40% higher than a competitor's turnkey quote. That experience taught us: compare total project cost, not just equipment price.
Cost components: Silo body and components (40-50% of total). Foundation design and construction (15-20%). Installation labor and equipment (10-15%). Electrical and automation (5-10%). Shipping and logistics (5-10%). Commissioning and training (2-5%).
Delivery Schedule
Standard silo timeline: Design and engineering (2-3 weeks). Material procurement (2-3 weeks). Fabrication (3-4 weeks). Shipping (2-8 weeks depending on destination). Installation (2-4 weeks).
Schedule acceleration: Expedite fabrication with overtime (adds 10-15% cost). Air freight for critical components (adds 20-30% shipping cost). Pre-order long-lead items before final design. Plan installation crew arrival to match delivery.
Commercial Terms
Payment structure: 30% advance with order to secure production slot. 60% before shipment from factory. 10% after successful commissioning. Alternative terms available for established customers.
Price validity: Quotes valid for 30 days (material prices fluctuate). Price adjustment clause for orders placed after validity period. Fixed price option with 5% premium. Currency hedging available for large orders.
Warranty and Support
Warranty coverage: 24 months structural warranty on silo body. 12 months on mechanical and electrical components. Coating warranty per coating manufacturer terms. Warranty excludes misuse, overload, and natural disasters.
After-sales support: Spare parts availability for 10+ years. Technical support by phone and email. On-site service available worldwide. Maintenance training for operator staff. Remote diagnostics for automated systems.
Frequently Asked Questions
Q: Can we visit the factory before purchase?
A: Yes. We welcome factory visits to see quality and discuss requirements. Virtual factory tours also available.
Q: Do you provide financing options?
A: We work with export credit agencies for project financing. Terms depend on project size and buyer creditworthiness.