Key Takeaways
- Local Code Compliance: Verify requirements before design finalization.
- Import Documentation: Proper customs paperwork prevents delays.
- Local Workforce Training: Knowledge transfer ensures quality.
- Spare Parts Strategy: Stock critical spares before commissioning.
- Time Zone Planning: Remote support requires schedule coordination.
Table of Contents
International Project Planning
A project in Nigeria was delayed 6 weeks because we hadn't accounted for local holiday schedules. The port closure during festive season left containers sitting at customs. Now we build local holiday calendars into every international project schedule and pre-clear documentation 30 days before shipping.
International project considerations: Identify local technical standards and codes. Determine import duties and tax requirements. Plan for local workforce availability. Establish communication protocols across time zones. Arrange for local subcontractor support.
Shipping and Logistics
Shipping methods: Container shipping for small components and equipment. Break bulk for large shell sections. Flat rack for oversized items like platforms. Plan shipping routes to avoid transshipment delays.
Customs documentation: Commercial invoice with detailed packing list. Certificate of origin for duty calculation. Mill certificates for steel materials. Import permits and licenses. Insurance certificates for transit coverage.
Local Compliance
Code compliance verification: Compare design standards with local requirements. Identify any additional local testing requirements. Verify welding procedure qualifications meet local codes. Confirm electrical certifications for local jurisdiction.
Local workforce development: Provide training on silo-specific construction techniques. Certify local welders to required procedures. Train local supervisors on quality requirements. Document all training for project records.
Remote Support
Remote technical support: Establish video conferencing for real-time guidance. Use augmented reality for remote inspection support. Provide detailed installation manuals with visual guides. Schedule support sessions across time zones.
Spare parts strategy: Identify critical spares (seals, sensors, valves). Stock 2-year supply of wear parts. Provide local supplier contacts for common items. Document part numbers and specifications clearly.
Frequently Asked Questions
Q: How do you handle different technical standards internationally?
A: We design to the most stringent applicable standard and provide equivalency documentation. Local code review is part of our project planning process.
Q: What support is available for remote installations?
A: We provide on-site supervision for critical phases and remote video support for ongoing work. AR technology allows real-time guidance for complex tasks.
Planning an international project? Manxing has installed silos in 40+ countries. Request Project Planning Support


