Train Bulk Loading
Train bulk loading adopts rapid train loading system, which is an efficient quantitative loading system that quickly and continuously loads solid materials into a train at a certain speed by means of automatic control. Compared with the simple loading system and the container station using loaders, the advantages of the rapid loading system are very prominent.
Introduction
The rapid train loading system has obvious advantages : High degree of automation. All equipment in the system are controlled and operated remotely and centrally through the PLC control system, and the operation fault information of all equipment is displayed on the control computer screen. Reliable operation of equipment, and less labor for the system. Fast loading speed. It takes 60 seconds for loading a 62-ton one-segment train, the shortest time is 40 seconds, and it takes 50 minutes to 80 minutes for loading the whole train with 66 segments. High loading accuracy. The static weighing accuracy of a weighing silo is ± 0.1 %, the loading accuracy of each segment of train is < ± 0.3 %, and the loading accuracy of the whole train is < ± 0.3 %. Good loading quality, smooth surface and balanced load. It is fully in line with railway operation requirements. Excellent environmental protection performance. The loading process of the whole system is fully enclosed, and the surface of the loaded train is compacted and solidified to seal the dust, with less coal spread, less coal dust and less environmental pollution.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
























