Horizontal Mixer

Horizontal mixer is applicable to mixing dry plaster, cement, binder, filling materials, refractory materials, gypsum products, insulating materials, building chemicals, feed and fillers.
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Horizontal Mixer
Introduction
The efficient continuous mixer can change the speed and direction of materials under the action of external force to ensure the uniform distribution of each component particle. Horizontal mixer is applicable to mixing dry plaster, cement, binder, filling materials, refractory materials, gypsum products, insulating materials, building chemicals, feed and fillers. At the same time, it achieves the optimal efficiency. The discharge port crosses the whole length of the mixing chamber, so it ensures that materials can be discharged out without residue in the shortest time. Basic Structure Continuous mixer consists of main body, driving device, and mixing knife.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000