Valve

Electric ball valve is suitable for occasions of frequent operation, two-position cut off and adjustment. It has the advantages of simple connection, compact structure, small size, light weight, low resistance, stable and reliable operation, etc. And it is usually used in occasions with strict sealing requirements, such as gas, liquid, and steam.
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Valve
Introduction
Electric ball valve: Electric ball valve is suitable for occasions of frequent operation, two-position cut off and adjustment. It has the advantages of simple connection, compact structure, small size, light weight, low resistance, stable and reliable operation, etc. And it is usually used in occasions with strict sealing requirements, such as gas, liquid, and steam. Electric flow control valve : The driving device of the electric flow control valve is an adjustable electric actuator, which is often used in series with a pneumatic switch valve. The flow is controlled by adjusting the opening angle of the cylinder valve flow section. It is mainly used in powder material flow control system.  Manual gate valve : The manual gate valve is composed of frame, screw nut, hand wheel, sprocket, and gate. It has the advantages of simple structure, light weight, flexible operation, easy disassembly and assembly, good performance and long service life. It is equipped with a soft protective cover so it is not affected by external dust and is suitable for controlling dust materials. Diverting valve: Diverting valve is mainly composed of valve body, valve shaft, valve plate, crank mechanism, electric push rod, etc. It adopts high-quality steel welding structure, has the characteristics of small size, light weight, low resistance, and can switch the material flow quickly. It is used for conveying granular materials and powdery materials. Fan-shaped valve: Fan-shaped valve is composed of valve body, fan-shaped gate, shaft, seal, actuator and other components. It is equipped with transmission positioning device to adjust the opening angle of the valve and adjust the material flow. It has the characteristics of simple structure, flexible opening, no jam and so on. It is suitable for controlling non-viscous solid powder, or particle and crystal materials which are less than φ30mm. Bar valve: The bar valve is mainly composed of frame and bar, which solves the problem that the flat gate valve has large opening and closing force and cannot be closed due to large material particles. It has the characteristics of simple structure, easy operation, no jamming, good rigidity, long service life and no maintenance. It is suitable for controlling small and medium crystals and bulk materials.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000