Grid
The steel structure grid is a spatial structure formed by a plurality of rods connected by nodes according to a certain grid form. It generally has a regular quadrangle cone, triangle cone and other structural forms.
Introduction
Grid structure has the characteristics of high rigidity, good integrity, strong seismic resistance capacity, high structural safety, light weight, saving steel and small structural height. It can effectively use building space. It has wide adaptability, and is suitable for small, medium and large span and various plane forms of construction. It has various material cross-section forms, and the small size material cross-section can achieve large-span construction. With uniform material specifications, it is suitable for factory production, which can effectively improve the progress of the project, and can be repeatedly assembled and disassembled and reused. Grid structure is widely used in the roof structure of strip-type stockyard, circular stockyard, workshop, gymnasium, exhibition hall and so on.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.



































