System Design
How It Works
The clinker storage solution includes: (1) Gravity feed from clinker cooler via chute, (2) Silo with thermal design (refractory lining, expansion joints), (3) Heavy-duty discharge system (apron extractor rated for 200°C), (4) Clinker transport to cement mill feed bins, (5) Dust control at transfer points, (6) Structural monitoring system (temperature, displacement).
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer

