Coal Storage Solution
Material: Coal (Pulverized, Raw, Petcoke)
System Design
How It Works
The coal storage solution is a safety-first system: (1) Inert gas purged pneumatic conveying, (2) Silo with explosion venting (calculated per NFPA 68), (3) Nitrogen blanketing maintaining Oâ‚‚ < 12% (or < 10% for high-volatile coal), (4) Continuous CO, Oâ‚‚, and temperature monitoring, (5) Automatic fire suppression system (COâ‚‚ or water deluge), (6) Explosion isolation on all connected equipment, (7) Comprehensive safety PLC with SIL 2 rating, (8) Remote monitoring and alarm notification.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000