Fly Ash Storage Solution
Material: Fly Ash (Class F, Class C)
System Design
How It Works
The fly ash storage solution includes: (1) Dense-phase pneumatic conveying from ESP/baghouse to silo, (2) Ceramic-lined silo with fluidized bottom, (3) High-efficiency dust collection (PTFE membrane, <10 mg/Nm³), (4) Dry, oil-free fluidization air system, (5) Discharge to bulk tanker loading or process feed, (6) Optional nitrogen inerting for high-carbon fly ash, (7) Integrated control system with ash handling DCS.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000