General Powder Storage Solution
Material: General Dry Bulk Powders
System Design
How It Works
Our general powder storage solution starts with material characterization: (1) Material testing (Jenike shear cell, wall friction, permeability), (2) Customized silo design based on test results, (3) Configurable aeration/discharge system, (4) Appropriate dust collection, (5) Material-specific safety features, (6) Modular design for future adaptation.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000