Wear-Resistant Materials for Abrasive Materials
Material Properties Manxing Engineering Team 10 min read 2026-08-19
Material Properties Manxing Engineering Team 10 min read 2026-08-19

Key Takeaways

Wear-Resistant Materials for Abrasive Materials
  • Abrasion Causes Rapid Wall Loss: Iron ore can cause 5-10mm/year wall loss in carbon steel.
  • Ceramic Liners Extend Life 10x: Alumina ceramic lasts 10+ years in abrasive applications.
  • Rubber-Ceramic Composites Absorb Impact: Combines ceramic hardness with rubber flexibility.
  • Dead-Bed Hoppers Protect Walls: Material-on-material sliding prevents steel wear.
  • Wear Plates are Replaceable: Sacrificial liners protect permanent structure.

When Wear Becomes Critical

An iron ore terminal in Australia was replacing silo bottoms every 18 months due to abrasion. We installed alumina ceramic liners and redesigned the hopper as a dead-bed system. After 8 years, the original ceramic liners are still in service - a 5x improvement in wear life.

Wear Mechanisms

Sliding wear: Material sliding against walls during discharge. Impact wear: Material falling from height onto surfaces.

Wear-Resistant Materials

Wear-resistant steels: Hardox 400/450/500 (400-500 HB). Ceramic liners: Alumina (1500-1700 HV). Polymeric liners: UHMW-PE for moderate abrasion.

Design Strategies

Dead-bed hoppers, replaceable wear plates at impact zones, smooth internal surfaces, proper hopper angles.

Frequently Asked Questions

Q: How do I know if my material is abrasive?

A: Materials with Mohs hardness > 5 (iron ore, copper ore, alumina) require wear protection. We assess abrasivity based on particle hardness and shape.

Having wear problems? Manxing can assess your wear issues and recommend cost-effective solutions. Request Wear Assessment

Written and reviewed by the Manxing silo engineering team · Last updated Aug 19, 2026

Prepared by our in-house bulk-handling engineers and checked against the design practice listed below. Questions about a specific project can be sent to our engineering desk through the contact page.

Standards and industry references

  • EN 1991-4 — Eurocode 1: Actions on structures, Part 4: Silos and tanks
  • ACI 313 — Design and construction of concrete silos and stacking tubes
  • GB 50077 — Code for design of reinforced concrete silos
  • ISO / ASABE bulk-solids handling guidance on material flow and segregation
Need Engineering Support?
Talk to our engineers about your specific requirements
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000