Smart Silo Storage Management System
-
Intelligent Silo Storage Management SystemManxing silo storage management system realizes system integration of all kinds of automatic storage equipment and visual management of a whole material storage and transportation project through the collection and monitoring of big data. Based on big data analysis, Manxing realizes the intelligent management of the system, which mainly includes 11 modules such as material management, energy management and equipment management.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More




