Silo Wall Thickness Calculation: Engineering Method
Engineering Design Li Minghua 12 min read 2026-08-13
Engineering Design Li Minghua 12 min read 2026-08-13

Wall Thickness Calculation

Silo wall thickness is governed by hoop tension from stored material pressure and external loads.

Hoop Tension

Maximum hoop tension occurs at the silo bottom and is calculated using Janssen or Reimbert theory.

Wind Loads

For tall silos, wind loads can significantly affect wall thickness requirements.

Need Engineering Support?
Talk to our engineers about your specific requirements
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000