Weighing and Metering System
-
Weighing ModuleWeighing module is a weighing device that supports the weighing sensor on the hopper. It can measure the weight of materials in the hopper, convert it into a digital display through an intelligent instrument, display the weight and material level, and output relevant high and low material level signals for control and display. -
Electronic Truck Scale Weighing SystemElectronic truck scale is a new type of electronic weighing instrument, with characteristics of rapid weighing, high accuracy, visual display and complete functions. It is suitable for industry, construction, silo storage and other industries.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More




