Fly Ash Separation System
Material Handling System
Bulk Material Storage System Material Handling System Intelligent Control System
Fly Ash Separation System
The raw ash or coarse ash discharged from coal-fired power plant is ground, dried and separated to achieve the fineness of finished ash, realize the comprehensive utilization of fly ash, and improve the economic benefit.
Fly Ash Separation System
Fly Ash Separation System
The fly ash stored in raw ash silo is discharged into air chute through silo bottom unloading device. After being lifted by a bucket elevator, it enters a separator for separation. Under the action of the separator, the fly ash of different particle sizes is separated.
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000