Long-distance Conveying System
The length of a long-distance conveying machine can reach tens of kilometers, it is applicable to mining area, wharf, and transfer station for long-distance and continuous conveying
-
Tubular Belt ConveyorTubular belt conveyor is also a widely used conveying equipment in long-distance conveying system. It is mainly used to convey powdery, granular and other bulk materials ( density is less than 2500kg / m³ ) and is suitable for the situation which has closeness requirements for the conveying environment. -
Belt ConveyorBelt conveyor is a kind of machinery which drives continuous transportation of material by friction. According to the requirements of the conveying process and different terrain and working conditions, conveyor system is formed through design and calculation.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More




