Packaging System
Manxing provides high-speed automatic packaging system for bulk products to ensure low dust, and high-precision packaging
-
Truck LoaderMobile bagged cement truck loader is the key equipment used in the bagged cement loading process in cement production enterprises. The equipment has a high automation degree, so the whole loading process of unloading bags from the upper part of vehicles can be completed by one person. -
Ton Bag Packing MachineTon bag packing machine is a large-scale weighing packing equipment for ton bag packaging materials. It is a multi-purpose packing machine integrating electronic weighing, automatic bag dropping and dust removal. -
Stacking RobotStacking robot is a product combined machinery and computer programs which greatly saves labor and space. It has flexible and accurate, rapid and efficient running, high stability and high working efficiency. -
Packing MachinePacking machine is divided into rotary packing machine and stationary packing machine. It has simple structure, convenient operation, high degree of automation, high yield, low energy consumption, high measurement accuracy, long service life, convenient maintenance and so on. It is an ideal bulk material packing equipment for medium and large -sized cement manufacturers.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More




