Bulk Material Stockyard
Large-span spacial grid structure is often used in bulk material storage yard, which has the advantages of reasonable stress, light weight, low cost and short construction period. Advanced bulk material stacking and reclaiming, storage, and handling systems are efficient environmental friendly.
-
Circular StockyardCircular stockyard has small land occupation and large storage capacity. It solves the problems of materials loss and flying in the process of piling or taking materials due to wind and rain. -
Strip StockyardStrip stockyard is widely used in the coal conveying system of thermal power plants and the production system of coal and metallurgical mines. It can store a variety of materials, and has the advantages of large storage capacity, small loss of multi-material storage, small invalid area of the yard blocks and land saving.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More