Steel Structure
Steel frame system including silo roof trestle, corridor truss, hoist tower, equipment support, ladder and guardrail is purchased from the top steel structure manufacturers in China to support the silo system.
-
-
Steel FrameFrame structure is mainly used for large and simple structures, such as plant, warehouse, hoist bracket, and factory office building etc. Structural steel components can be quickly manufactured off-site and then transported to the construction site when needed, minimizing on-site labor requirements and reducing the impact of variables that may delay a project, such as inclement weather. -
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More





