Feeding System
The lifting and feeding system is an indispensable part of the silo systems. Its main function is to vertically lift and transport the materials into the silo, and it is widely used in the lifting of bulk materials in factories, grain depots, port wharf and so on.
-
-
Tgd-Type Wire Belt Bucket ElevatorTGD-type wire belt bucket elevator has the features of large conveying capacity, high lifting height, small size, low power consumption, stable and reliable operation and long service life. It is suitable for vertical lifting of dry bulk materials with temperature ≤130℃. -
Plate Chain Bucket ElevatorPlate chain bucket elevator takes steel chain as the traction member. Bucket adopts intensive and large-capacity arrangement, and it adopts inflow feeding and gravity-induced or centrifugal gravity-induced discharging methods. This kind of elevator runs smoothly and is suitable for lifting powdery, granular and nubby materials.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More




